240 m RCC pre-stressed bridge, Thano

A 240 m river bridge with well foundations and a pre-stressed superstructure, executed back-to-back with Rana Builders. It was the first bridge project NIPL took on after incorporation.

Status
Completed
Contract value
₹14.55 Cr
Client
PWD Uttarakhand
Main contractor
Rana Builders (back-to-back)
Location
Thano, near Dehradun, Uttarakhand
Started
2021
Type
River bridge
Completed 240 m RCC pre-stressed bridge at Thano, its deck lined with crash barriers and railings, hills behind
Completed 240 m RCC pre-stressed bridge, Thano, Uttarakhand

01 NIPL scope

NIPL scope

A 240 m RCC pre-stressed river bridge at Thano, near Dehradun, built for PWD Uttarakhand and executed back-to-back with Rana Builders. Work started in 2021, the year NIPL was incorporated, and the project is complete.

The scope included well foundations and a pre-stressed superstructure. The photographs below show well steining formwork and reinforcement in progress, with NIPL engineers supervising.

  • 01Well foundations and steining
  • 02Pre-stressed superstructure
  • 03RCC works

Work orders and completion certificates can be shared on request.