People, plant and formwork that mobilise as one site unit.

NIPL keeps its core engineering and plant team on its own payroll and maintains its own concrete production, formwork and survey inventory. Clients get a team that already works together, with the equipment to start structural work.

Hydra crane lifting reinforcement bars onto a structure under construction at dusk
Hydra crane placing reinforcement on a structure

01 Team

An in-house team of 21, led on site by the founder.

Specialist activities are covered by empanelled subcontractors who work under NIPL’s supervision.

Civil engineers
8
3 B.Tech and 5 diploma engineers
Machine operators
10
On NIPL’s own payroll
Support staff
3
Accountant, HR manager, Electrician
Directors
2
Suresh Sharma and Anita Sharma

Site execution unit

Engineers, operators, plant and formwork, deployed as a single mobilisation.

  1. Survey
  2. QA/QC lab
  3. Execution
  4. Measurement

Empanelled specialists, under NIPL supervision

  • RE panel casting and erection
  • Crash barrier casting and erection
  • Labour supply and allied works
The NIPL site team standing in front of the NIPL site office, with the national flag raised
The NIPL site team at the site office

02 Plant, machinery & formwork

Plant and formwork register.

Ownership is shown as recorded by the company. Hired items are listed as hired. Additional plant is arranged as each project requires.

Why the formwork matters

238 well shuttering units of 7 m diameter, 600 shuttering plates and I-girder, friction slab, crash barrier and RE wall moulds. Formwork does not have to be fabricated or hired for each new project.

Site team working on top of circular steel well steining formwork with vertical reinforcement bars
NIPL well shuttering in use, Thano
Earthmoving & handling
ItemQtyOwnership
JCB backhoe loader 2 1 owned, 1 hired
Grader 1 Owned
Tractor grader 1 Owned
Soil compactor 1 Owned
Hydra crane 1 Owned
Dumper truck 2 Hired
Tractor trolley 2 Owned
Water tanker, 12,000 L 2 Owned
Concrete production & placing
ItemQtyOwnership
Batching plant, 30 HP 1 Owned
Gamzen mini batching plant 1 Owned
Self-loading concrete machine 1 Owned
Concrete pump 1 Owned
Concrete vibrator 8 Owned
Welding machine 7 Owned
Formwork & shuttering
ItemQtyOwnership
Well shuttering, 7 m diameter 238 Owned
Shuttering plates 600 Owned
I-girder shuttering 2 Owned
Friction slab, crash barrier and RE wall shuttering 10 Owned
Survey, testing & weighing
ItemQtyOwnership
Total station 2 Owned
Auto level 3 Owned
MoRTH lab equipment 2 sets Owned
100 tonne weighbridge 1 Owned

03 On site

Plant at work on NIPL sites.

04 Quality, survey & safety

Work that is checked before the client’s engineer checks it.

Rework is the most expensive thing an execution partner can hand a client. NIPL’s founder began his career as a chief surveyor and resident engineer, and the company is set up to inspect its own work first.

01Quality control

  • Work executed to approved drawings, MoRTH specifications and the project quality assurance plan
  • Two sets of MoRTH laboratory equipment for site testing of materials and concrete
  • Reinforcement checked for bar size, spacing and cover before every pour
  • Controlled concrete from our own batching plants

02Survey & measurement

  • Two total stations and three auto levels for setting out and level control
  • 100 tonne weighbridge for material receipts
  • Joint measurement records maintained to support running bills and certification

03Health, safety & environment

  • Site safety briefings and PPE for workers and staff
  • Planned lifting and work at height on bridge structures
  • Safe working near live traffic and overhead transmission lines
  • Housekeeping and responsible handling of excavated material
Workers tying deck slab reinforcement on a bridge above a wide boulder riverbed
Deck slab reinforcement on a river bridge
A tape measure held against vertical bars of a pile reinforcement cage
Checking pile cage reinforcement before lowering, NH-76 ROB
Concrete pouring from a chute into a tremie hopper while engineers watch
Pile concreting by tremie, NH-76 ROB
Rotary piling rig lifting a reinforcement cage, with high-voltage transmission towers behind
Piling alongside live transmission lines, NH-76 ROB

05 Mobilisation

Mobilisation is planned for each project.

We do not quote a fixed mobilisation time. How quickly and with what equipment we mobilise depends on the project, and we agree it with the client before work starts.

  • 01Distance from Dehradun or an existing project office
  • 02Duration of the project and its programme
  • 03Scope and budget agreed in the contract
  • 04Economics of moving owned plant versus hiring locally

Discuss a project

Have a project that needs a dependable execution partner?

Share the scope, drawings or BOQ. We will review the project, visit the site if needed, and come back with our approach, resources and terms.